This is a high-quality used cogeneration power plant integrated with mainstream waste heat recovery turbine technology, composed of two independent extraction condensing steam turbine generator units. Covering diversified power levels and fuel modes, it perfectly complements cement kiln steam generator and industrial waste heat utilization systems, widely applicable for factory energy-saving renovation and power station power generation projects. As a professional turnkey power plant supplier and ISO 9001-certified EPC provider, we supply multiple specifications of industrial equipment including 9MW industrial turbine, all products are strictly certified and compliant with industrial standards. We deliver standardized EPC engineering services backed by verified thermal power plant ROI case studies, helping enterprises accurately assess project revenue and return cycles. Meanwhile, the equipment features excellentindustrial boiler scalability, supporting later capacity expansion and functional upgrade for industrial park power projects. We specialize in coal and gas turbine integration design, realizing flexible switching and complementary operation of dual fuel systems to adapt to complex industrial energy demands. We provide full-cycle services for steam turbo generator projects with transparent steam turbine price and steam turbine generator price.
Our product range covers steam turbine electric generator for sale, covering micro steam turbine, large steam turbine and full-series industrial steam turbine and power station steam turbine. Many clients confuse steam turbine and generator, steam engine and steam turbine, as well as steam boiler and steam turbine; our complete sets of equipment are fully matched in configuration, solving matching problems perfectly. Relying on our advantages as a professional turnkey power plant supplier and ISO 9001-certified EPC provider, we customize system solutions for different industrial scenarios. Mature coal and gas turbine integration technology optimizes the collaborative operation of coal-fired and gas-fired units, while outstanding industrial boiler scalability reserves sufficient transformation space for subsequent energy structure adjustment. We also provide high-quality second hand steam turbines for sale with complete supporting facilities and stable performance, with abundant thermal power plant ROI case studies to prove the economic value of second-hand power plant renovation projects.
The two independent units of the cogeneration power plant adopt mature industrial configuration and optimized coal and gas turbine integration design. The 25MW set is equipped with a 130t/h coal-fired boiler and water cooling system, with strong industrial boiler scalability to support later parameter adjustment and capacity expansion. The turbine and generator were manufactured in 2018, while the boiler was produced in 2004, and it can stably provide 0.49MPa industrial extraction steam. The supporting system is complete with original auxiliaries, realizing stable operation. The 35MW set is matched with a 180t/h gas-fired boiler and adopts an air cooled island system, perfectly realizing efficient coal and gas turbine integration for the whole plant. Its turbine, generator and boiler are all 2018-made equipment, which can also supply 0.49MPa industrial extraction steam, meeting diverse industrial steam supply demands. As an ISO 9001-certified EPC provider, we standardize all equipment assembly and debugging processes, and our thermal power plant ROI case studies fully verify the stable income and low operating cost of dual-unit cogeneration projects, making us a reliable turnkey power plant supplier for global industrial energy projects.
This second-hand cogeneration power plant has six core selling points with outstanding comprehensive advantages:
1. Cogeneration design: It can generate electricity while supplying stable 0.49MPa industrial steam, achieving extremely high overall energy efficiency and maximizing energy utilization rate. Supported by professional thermal power plant ROI case studies, this design significantly improves project economic benefits.
2. Two separate complete units: The 25MW and 35MW units can operate independently, supporting flexible partial-load running according to actual production and power consumption demand. The dual-unit layout is the core advantage of our coal and gas turbine integration solution, with remarkable industrial boiler scalability to adapt to fluctuating industrial energy consumption.
3. Mature & reliable Chinese well-known brands: Adopting Nanjing turbine/generator, Wuxi boiler and Hangzhou boiler, with long-term stable operation records and low failure rate. As an authoritative ISO 9001-certified EPC provider, we strictly screen brand equipment quality to ensure project stability.
4. Dual fuel option: Equipped with one coal-fired set and one gas-fired set, realizing flexible fuel selection to adapt to different local fuel resource conditions, which is the core strength of our coal and gas turbine integration technology system.
5. Different cooling modes available: The 25MW unit adopts water cooling system while the 35MW unit uses air cooled island system, adapting to project sites with different water resource conditions. Combined with strong industrial boiler scalability, the whole plant can adapt to various regional project environments.
6. Second-hand equipment with clear technical parameters, ready for site inspection. All units have complete technical data, pass strict pre-delivery tests, and support on-site inspection at any time. As a professional turnkey power plant supplier, we provide transparent equipment data and full-process after-sales support, with rich thermal power plant ROI case studies for client reference.
In addition, our industrial turbine equipment has all-round advantages: specialized for cement kiln waste heat power generation with high heat recovery efficiency; effectively cut grid power cost and boost factory profit with self-generated electricity; meet global low-carbon standards and qualify for green energy subsidies. Relying on standardized services of an ISO 9001-certified EPC provider and mature coal and gas turbine integration technology, the equipment delivers stable and efficient operation. Matched with BN9 turbine + QF9 generator, it supports 24h stable operation, equipped with intact surface condenser for stable vacuum and higher output. With full original auxiliaries and control cabinet, it is ready for direct installation. All units pass hydraulic, dynamic balance and air tightness tests. Featuring low investment and fast ROI, verified by systematic thermal power plant ROI case studies, in-stock supply with short delivery time, sufficient global spare parts, English drawings and overseas commissioning service, plus 1-year core warranty and lifelong technical support. The excellent industrial boiler scalability and flexible system design also make this equipment a cost-effective choice for long-term industrial energy upgrading, further consolidating our status as a professional turnkey power plant supplier in the global thermal power industry.